385 daysto the US HazCom 2024 mixture SDS deadline

Draft SDSs & GHS classifications in minutes, not days.

GHSLogic combines AI hazard extraction with a deterministic GHS engine,20 regulatory-list checks and print-ready labels — for US, EU and Canada. Built by a regulatory professional.

Prefer to watch first? See the 4-min demo →

Free plan included · US HazCom · EU CLP · Canada WHMIS · 20 regulatory lists

GHSLogic project dashboard listing chemical mixture projects
20
Regulatory lists checked
119k+
Substance records
3
Jurisdictions (US · EU · CA)
16
SDS sections generated

Every output is a draft decision-support document and must be reviewed by a qualified SDS/GHS/regulatory professional before use or distribution.

Why teams switch to GHSLogic

SDS authoring, classification and labels in one workflow

Stop stitching together spreadsheets, PDFs and separate label tools. GHSLogic takes you from raw composition to a reviewed-ready draft SDS and matching label.

Hours, not days

AI extraction and a one-click classification engine collapse the busywork of reading SDSs and computing mixture hazards.

Defensible by design

Deterministic rules, visible confidence scores, source dates and a mandatory review footer — AI never overrides the classification.

Nothing hidden

Missing data is flagged, never silently filled. CBI and EU REACH Annex II rules are enforced automatically.

Audit any SDS — free

Already have finished SDSs? Upload one and get it screened free against the regulatory lists for outdated entries, revision age, pre-GHS phrases, missing UFI and 16-section gaps — plus a HazCom 2012→2024 migration mode.

US, EU & Canada

One project, the right rules: HazCom, CLP/REACH and WHMIS — including UFI generation for EU labels.

SDS + label together

Labels are legally inseparable from SDSs. Generate both from the same computed data, QR-ready.

Composition

Build the mixture once — CBI and EU REACH handled for you

Enter exact, range, max, or confidential concentrations. GHSLogic enforces EU REACH Annex II trade-secret rules at 0.1% automatically and supports nanomaterial and R&D components. Import a whole formulation from a spreadsheet.

  • CBI / trade-secret controls
  • Spreadsheet bulk import
  • Nano & R&D component fields
GHSLogic composition editor showing components with concentration ranges and CBI controls

AI extraction

Upload your actual supplier SDS — get structured hazard data back

Claude AI reads supplier PDFs and DOCX (even scanned, image-only sheets) and returns hazard classes, pictograms, signal words, H/P statements, exposure limits and transport data — each with a confidence score and flagged conflicts for your review. Working from your real supplier's sheet, not a generic substance SDS, means impurity-driven hazards are captured accurately — and drop off automatically when you switch to a supplier whose material doesn't carry them.

  • PDF, DOCX & scanned-image OCR
  • Captures supplier-specific impurities
  • Confidence scores & conflict detection
GHSLogic extraction review screen with confidence scores on extracted SDS hazard data

Classification

A deterministic GHS engine — not an AI guess

Acute toxicity by the ATE formula, sum-of-parts for skin, eye, STOT and CMR hazards, flash-point flammability, and additive OEL math. AI never overrides the rules. Out comes the signal word, pictograms and a label-ready precautionary-statement set.

  • ATE + sum-of-parts + flash point
  • US HazCom / EU CLP / Canada WHMIS
  • Label-ready P-statement subset
GHSLogic GHS mixture classification results with signal word, pictograms and hazard categories

Regulatory checks

Every component screened against authoritative regulatory lists

Deterministic CAS and name matching against SVHC, REACH Annex XIV/XVII, CLP Annex VI, EU PIC/POPs and precursor lists, EPA TSCA, CERCLA, EPCRA, Prop 65, IARC, NTP and OSHA carcinogen lists — flagged by severity, with source dates shown. No AI inference on list membership.

  • SVHC · Prop 65 · IARC · CERCLA & more
  • Severity-ranked flags
  • Source dates on every match
GHSLogic regulatory checks screen listing flags by severity across regulatory lists

Labels

Print-ready GHS labels straight from the classification

Generate container and workplace label PDFs in standard sizes or Avery sheets — pictograms, signal word, hazard and precautionary statements, supplier identification and UFI (EU), QR-ready. SDS and label authoring in one place.

  • 4×6, 4×4, 3×4, letter & Avery
  • UFI for EU labels
  • QR-ready for hosted SDS
GHSLogic GHS label preview with pictograms, signal word and hazard statements

Draft SDS & export

A complete 16-section draft SDS — then export it

Section-by-section draft generation with review and approval status, a finalize guardrail that blocks unfinished placeholders, version diffs and reissue reminders. Export to TXT, DOCX and PDF with your branding — or translate into seven languages.

  • 16-section generator + guardrail
  • TXT / DOCX / PDF with branding
  • 7-language translation drafts
GHSLogic 16-section draft SDS editor with section review status

SDS audit — free to try

Already have SDSs? Check them against today's rules

Upload an existing finished SDS and GHSLogic screens it against the current regulatory lists for your jurisdiction — flagging outdated listings (new SVHC / Prop 65 / IARC / CERCLA & more), an aged revision date, legacy pre-GHS phrasing, missing UFI and 16-section gaps. A built-in HazCom 2012→2024 migration mode itemizes exactly what must change. Every free plan includes three audits.

  • Severity-ranked findings: critical → info
  • Standard + HazCom 2024 migration modes
  • 3 audits free, no project needed
GHSLogic SDS audit results listing findings by severity across regulatory lists and HCS-2024 migration items

See it in action

A full SDS, classified and drafted — in 4 minutes

Watch the end-to-end workflow: composition, AI extraction, GHS classification, regulatory checks, labels and a draft SDS export.

How it works

From composition to compliant draft in four steps

1

Create a project

Pick a jurisdiction (US, EU, US+EU or Canada) and add your supplier details.

2

Add composition & SDSs

Enter or import components, then upload supplier SDSs for AI hazard extraction.

3

Classify & review

Run the GHS engine, check regulatory flags, and review every output with confidence scores.

4

Export SDS & labels

Generate a draft SDS, print-ready labels and branded exports — ready for professional sign-off.

Regulatory coverage

20 lists · 118,735+ substance records

All checks are deterministic matches against official source data — no AI inference on list membership, and every match shows its source date.

ECHA CLP Annex VI Table 3 (harmonised entries workbook)EUECHA CLP Regulation Annex VI Harmonised ClassificationsEUECHA REACH Annex XIV Authorisation ListEUECHA REACH Annex XVII RestrictionsEUECHA REACH Registered SubstancesEUECHA SVHC Candidate ListEUEU Drug Precursors (Regulation (EC) No 273/2004, Annex I)EUEU Explosives Precursors (Regulation (EU) 2019/1148, Annexes I-II)EUEU Ozone Regulation Annexes I-II (Regulation (EU) 2024/590)EUEU PIC Regulation Annex I (Regulation (EU) 649/2012)EUEU POPs Regulation Annex I (Regulation (EU) 2019/1021)EUIARC Monographs Carcinogen ClassificationsGLOBALEPA CERCLA Hazardous SubstancesUSEPA Clean Air Act Hazardous Air PollutantsUSEPA EPCRA Section 302 Extremely Hazardous SubstancesUSEPA EPCRA Section 313 TRI ChemicalsUSEPA TSCA Chemical Substance InventoryUSNTP Report on CarcinogensUSOEHHA Proposition 65 ListUSOSHA 13 Regulated Carcinogens (29 CFR 1910.1003-1910.1016)US

Pricing

Start free. Upgrade when you ship.

Founding-customer offer: Professional at $99/mo — locked for life (regularly $199/mo).

Free

$0

No credit card required

  • ✓1 project
  • ✓Up to 10 AI SDS extractions
  • ✓Full GHS classification & 20 regulatory list checks
  • ✓3 free SDS audits (incl. HazCom 2024 check)
Most popular

Professional

$99 / mo

$199/mo · founding price locked for life

  • ✓Unlimited projects
  • ✓Draft SDS generator + exports
  • ✓Print-ready GHS labels
  • ✓Regulatory change alerts & team access

Frequently asked questions

Is GHSLogic a certified SDS authoring tool?

No. GHSLogic is a draft decision-support assistant. Every output carries a mandatory disclaimer and must be reviewed by a qualified SDS/GHS/regulatory professional before use or distribution. It reduces authoring time — it does not replace professional judgement.

Which jurisdictions does it cover?

US (OSHA HazCom 2012/2024), EU (CLP / REACH) and Canada (WHMIS 2015), plus a combined US+EU workflow. Each applies the right classification rules and label requirements for that region.

How does the AI extraction work?

Upload a supplier SDS (PDF or DOCX, including scanned image-only sheets) and GHSLogic extracts hazard classes, pictograms, signal words, H/P statements and exposure limits using Claude AI — shown with confidence scores and flagged conflicts. The deterministic classification engine never relies on the AI for the final result.

Can I try it before paying?

Yes. The Free plan lets you create a project and run full regulatory checks, GHS classification and 3 SDS audits — no credit card required. Exports, the draft SDS generator, labels and translations are on Professional.

Is my composition data secure?

Yes. Data is stored in a PostgreSQL database with row-level security; CBI/trade-secret designations are enforced at the API layer and EU REACH Annex II rules are applied automatically. MFA is available for additional account security.

More questions? See the full FAQ or contact us.

Get your next SDS to review-ready faster

385 days remain until the US HazCom 2024 mixture SDS deadline. Start drafting today — free, no credit card.